Repair and temporary dam at Mount Polley Mine near Williams Lake.

Mount Polley design, steep additions led to failure

Glacial layer in dam base not understood, plans to buttress slope put off until weight of water and tailings caused breach

The Mount Polley mine dam failed because of an overlooked glacial material layer in the foundation and a series of steep additions that eventually overcame it, an independent engineering review has concluded.

“Basically the weight of the dam was too much for the weak materials in the foundation to bear,” said U.S. consulting engineer Steven Vick, one of three experts called in to examine the failure that caused the dam to breach and fail in August 2014.

The report concludes that the concrete-like glacial till material in the base of the dam wasn’t understood in enough detail when the dam was designed and built in 1997. Later raising of the dam to hold more water and tailings weakened the base layer and led to the failure.

Vick said the additions to the dam were built at a steeper slope than the original dam, and plans to buttress the area were delayed until it was too late.

Energy and Mines Minister Bill Bennett said the report shows there were no warning signs, and no surface inspections could have detected the problem that was overlooked in the design and original construction.

Two more investigations of the mine failure are pending. Bennett said the Chief Inspector of Mines is likely to release his report by June, and the Conservation Officers’ Service will also report when its investigation is complete.

Bennett said the government is willing to see the Mount Polley mine reopen, but the other investigations must be complete first. The parent company Imperial Metals has applied to use an existing pit to store tailings and resume operations without using the original tailings pond again.

 

Just Posted

Fire burning near Olalla still out of control

BC Wildfire crews are responding to a 144 hectare blaze near Keremeos

Sparks set to fly in new Okanagan College welding facility

Welding students based in Penticton will now have access to the new, $2.2 million facility

BC Wildfire crew rescues lost puppies

They were just leaving the Monashee Complex of fires when they found the cutest creatures.

Okanagan’s smoke filled skies toxic to pets

Pet owners should take extra precautions with pets until smoke dissipates

New grandma wants a place on town council to improve Princeton for families

A Princeton woman has stepped forward and declared her intention to run… Continue reading

More smoggy air for the Okanagan

Breathing conditions are improving, though still not ideal

Trudeau says he won’t apologize to heckler, pledges to call out ‘hate speech’

Prime Minister had accused woman of racism as she shouted about illegal immigration at Quebec rally

Documentary filmed in B.C. nominated in ‘Wildlife Oscars’’

Toad People is the only Canadian film to be nominated in this year’s Panda Wilderness Awards

B.C. man builds 10-foot sign thanking fire responders

Ken Rawson built his “thank u” sign on Saturday as helicopters responded to fires around the province.

Crews continue mop up at Gottfriedsen Mountain wildfire

Firefighters are working alongside the military to extinguish the wildfire near West Kelowna

PHOTOS: Olympian Patrick Chan helps B.C.’s ‘SuperChefs’ celebrate 10th anniversary

Former figure skater among those at event Friday in Surrey

North Okanagan parks receiving upgrades

Swan Lake Nature Reserve, Mutrie Dog Park and BX Ranch Dog Park to benefit from work

Wildfires grow near Lumby, Cherryville

Canadian Armed Troops in Okanagan, Mabel Creek blaze creeps towards lake

Smaller B.C. bus service prepares to replace Greyhound

Kootenay-to-Okanagan run would require online reservations

Most Read